The requirements and their documents
As the Saudi Electricity Company publishes in its local supplier and manufacturer registration requirements and its manufacturer qualification portal. Reviewed on:
| The requirement as the buyer publishes it | The document in our package, by code |
|---|---|
| Quality assurance manual |
|
| List of quality procedures and their copies |
|
| Document and record procedures |
|
| Internal audit procedure |
|
| Nonconformity procedure |
|
| Corrective and preventive action procedures |
|
| Purchasing quality control and supplier and subcontractor evaluation procedure |
|
| Occupational health and safety management system policy |
|
| Safety structure and responsibilities |
|
| Management of change |
|
| Incidents and investigation |
|
| Emergency response |
|
| Environmental compliance |
|
What the documents do not cover
- An accredited certification body issues the certificate after auditing your management system. doooqs prepares the documents for that system.
- The unified contract for building, operating and maintaining distribution networks up to 36kV: a questionnaire on the QA/QC programme, the OHSMS policy, the safety structure and responsibilities, environmental compliance, management of change, incidents and investigation, emergency response and control plans. These fields belong to that contract category.
- Local registration: the commercial registration, chamber, zakat, social insurance, Saudisation and VAT certificates; the manufacturer’s industrial licence; the product list; the owners’ and authorised signatories’ details; the bank letter and IBAN; financial statements and a signed code of conduct. Exceptions are stated for new establishments. Distribution-material qualification adds manufacturing experience, supply references, SDMS conformity, accredited type tests and a warranty.
- A sample quality control plan for your product and its routine test reports.
- Check each buyer’s requirements in its own portal, since they change and may include licences and registrations the documents do not cover.
Questions
Does Saudi Electricity Company require an ISO certificate, or is a documented system enough?
The requirements file for distribution-material manufacturers asks for ISO 9001 and ISO/IEC 17025 certificates, and ISO 14001 and OHSAS 18001 certificates are attached where they exist. The published unified-contract contractor form asks about ISO 9001 and ISO 45001 and asks for the certificate where one exists. General local registration rests on the legal and financial documents.
Which management system documents does Saudi Electricity Company ask for by name?
Distribution materials: the quality assurance manual, the list of quality procedures and their copies; the procedures for documents and records, internal audit, nonconformity, corrective and preventive action; a sample quality control plan; routine test reports; and the procedure for purchasing quality control and the evaluation of suppliers and subcontractors.
Buyer names belong to their owners; this answer is guidance, does not represent any buyer and promises neither qualification nor a certificate.